
CASE STUDY
BT Adastral Park
Smart spaces for smarter work: Changing facility upgrade at BT Adastral Park
We successfully delivered a full turnkey installation of new changing room facilities at BT’s live site in Ipswich. The project encompassed a complete HVAC refurbishment along with extensive internal upgrades at Adastral Park - BT’s renowned research and development centre, set in 100 acres of landscaped surroundings near Martlesham Heath, Suffolk.
BT required a full redesign and refurbishment of its existing changing room facilities to meet modern standards of hygiene, accessibility, and energy efficiency. The work had to be completed without interrupting the use of the on-site gym, a key amenity for staff. To ensure continuity, we installed high-quality temporary facilities, allowing operations to continue seamlessly throughout the programme.
The completed facility now offers a clean, modern, and inclusive environment that aligns with BT’s commitment to staff wellbeing and sustainability. This project enhanced both the visual appeal and operational performance of the space, all while maintaining the full functionality of adjacent facilities.
Task: Design & Full Turnkey Installation
Client: BT Research & Development
Location: Ipswich
Our comprehensive solution included:
Interior fit-out and finishes
Full strip-out of the existing changing rooms
Bespoke reconfiguration to optimise space, circulation, and usability
Installation of hygienic wall cladding to support infection control and ease of maintenance
Durable, wipeable suspended ceilings designed for humid environments
Compact-grade laminate WC and shower cubicles, combining aesthetics with robust, long-lasting performance
Fully integrated IPS (Integrated Panel System) for efficient and clean service access
Dedicated accessible WC and shower facilities, meeting all DDA requirements
Building services upgrades
Full upgrade of the HVAC system, including:
Adaptation of existing ductwork to suit the new layout
Full deep-clean and sanitisation of retained ductwork to remove dust, dirt, bacteria and other contaminants—ensuring maximum air quality and operational efficiency
Installation of a new BMS (Building Management System) to enhance environmental control and energy management
Upgraded energy-efficient LED lighting throughout